ProCoder™)R900i™ Installation and Maintenance Guide 11
Chapter 4: Installing the ProCoder™)R900i™
This chapter describes the installation process for the ProCoder™)R900i™.
Prior to Installation
This section provides information on:
l Storing and unpacking the ProCoder)R900i
l Site selection
l Preliminary tests, tools, and materials needed for installation
Complete these procedures before you install the ProCoder.
Storage
Upon receipt, inspect the shipping containers for damage, and inspect the contents of
any damaged cartons prior to storage.
After you inspect the cartons, store them in a clean, dry environment. Ensure the unit is
in sleep mode until it is exposed to light.
Unpacking
Handle the ProCoder)R900i carefully; however, no additional special handling is
required. When shipped, the assembly is lying on its side. Lift the assembly out of the
box by the meter maincase.
After unpacking the ProCoder)R900i, inspect it for damage. If the ProCoder)R900i
appears to be damaged or proves to be defective upon installation, notify your
Neptune Territory Manager or Distributor. If one or more items requires reshipment,
use the original cardboard box and packing material.
Figure 5 – ProCoder™)R900i™ Installation