EasyManuals Logo

NETGEAR AV Series Hardware Installation Guide

NETGEAR AV Series
45 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #34 background imageLoading...
Page #34 background image
1
2
3
4
5
6
7
8
9
Figure 11. Package contents
To check the package contents:
1.
Place the container on a clean flat surface, and cut all straps securing the container.
2.
Unpack the hardware from the boxes by carefully removing the hardware and placing
it on a secure and clean surface.
3. Remove all packing material.
4.
Verify that the package contains the following items:
ItemNumber
Switch of the model that you ordered.
Note: Rubber protection caps are installed in the SFP sockets. If you install an SFP transceiver
module, you must remove the cap from the SFP socket.
1
AC power cable (varies by region).2
USB console cable.3
Installation guide.4
RJ-45 RS-232 console cable.5
Hardware Installation Guide34Installation
AV Line of Fully Managed Switches M4250 Series

Table of Contents

Other manuals for NETGEAR AV Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the NETGEAR AV Series and is the answer not in the manual?

NETGEAR AV Series Specifications

General IconGeneral
ModelAV Series
Switching CapacityVaries by model
Quality of ServiceYes
Jumbo Frame SupportYes
Energy Efficient EthernetYes
Ports5, 8, 16
LayerLayer 2
MountingDesktop
SpeedGigabit Ethernet
Power BudgetVaries by model
Fanless DesignYes

Related product manuals