EasyManua.ls Logo

NETGEAR M4350 Series - Page 52

NETGEAR M4350 Series
70 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1
3
2
6
5
7
8
9
10
4
Figure 16. Package contents for an M4350 series half-width model
To check the package contents:
1.
Place the container on a clean flat surface, and cut all straps securing the container.
2.
Unpack the hardware from the boxes by carefully removing the hardware and placing
it on a secure and clean surface.
3. Remove all packing material.
4.
Verify that the package contains the following items:
ItemNumber
Switch of the model that you ordered
Note: Rubber protection caps are installed in the SFP sockets. If you install an SFP transceiver
module, you must remove the cap from the SFP socket.
1
AC power cable or cables (varies by region)2
Type-C USB console cable3
Hardware Installation Guide52Installation
Fully Managed Switches M4350 Series

Table of Contents

Related product manuals