EasyManuals Logo

Nexo GEO S12 Series System Manual

Nexo GEO S12 Series
95 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #60 background imageLoading...
Page #60 background image
GEO S12 HARDWARE SETUP PROCEDURE
Page 60 / 95 System Manual GEOS12 LS18
6.5 Testing and Maintenance of the system
General: GEO is a precision piece of equipment and requires regular attention to maintenance in order to give long and reliable
service. NEXO recommends regular testing of loudspeaker rigging components, preferably using a suitable test rig coupled with
a visual inspection.
Fasteners: there are several critical points in the LS18 and GEO S12 cabinets.
Of primary concern are:
a) The grid screws attaching the grid to the cabinet
b) The machine screws attaching the connecting plates to the cabinet.
c) The screws attaching the directivity flanges to the front of the cabinet.
These fasteners should be regularly checked and tightened as necessary.
Cleaning: The exterior of the cabinet and the rigging system can be cleaned with a damp cloth soaked in mild soapy water. On
no account use solvent based cleaners, which may damage the finish of the cabinet
After cleaning, the rigging system must be treated with a suitable lubricant to prevent rusting. NEXO recommends the use of
Scottoil FS365 which is a water-based lubricant with a mixture of machine oil, surfactant and anti-rust treatment.
.

Table of Contents

Other manuals for Nexo GEO S12 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Nexo GEO S12 Series and is the answer not in the manual?

Nexo GEO S12 Series Specifications

General IconGeneral
BrandNexo
ModelGEO S12 Series
CategorySpeaker System
LanguageEnglish

Related product manuals