EasyManua.ls Logo

Nexo GEO S12 Series

Nexo GEO S12 Series
112 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 58/112 GEO S12 HARDWARE SETUP PROCEDURE
Lift and position assembly, connect lifting rings to suspension points with sling and shackle;
Secure assembly with secondary safety steel.
IMPORTANT
The requirements for secondary safety systems vary with territories. However, the
secondary safety steel MUST have a SWL equivalent or greater than that of the rigging
system.

Table of Contents

Other manuals for Nexo GEO S12 Series

Related product manuals