EasyManua.ls Logo

Oriental motor US2D6-JA - Maintenance Inspection; Periodic Inspection Items

Oriental motor US2D6-JA
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Inspection
25
9 Inspection
It is recommended that periodic inspections would be conducted for the items listed below after each operation of the motor.
If an abnormal condition is noted, discontinue any use and contact your nearest Oriental Motor sales ofce.
Note
Conduct the insulation resistance measurement or dielectric strength test separately on the motor and
the speed controller.
Conducting the insulation resistance measurement or dielectric strength test with the motor and speed
controller connected may result in damage to the product.
The speed controller uses semiconductor elements. So be extremely careful when handling them.
Static electricity may damage the speed controller.
Inspection item
Are the mounting screws of the motor/gearhead loose?
Are there any abnormal noises in the motor bearings (ball bearings)?
Are there any abnormal noises in the bearing (ball bearing) and gear meshing parts of the gearhead?
Are the gearhead output shaft and load shaft out of alignment?
Are there any scratches or signs of stress in the cable, or are there any loose connections between the motor and speed
controller?
Are the openings in the speed controller blocked?
Are any of the speed controller connectors loose?
Are there any unusual smells or appearances in the speed controller?

Related product manuals