EasyManua.ls Logo

Panasonic AlCare TK-AS500 - Steps to Take Before Operation; Installation 1: Check accessories

Panasonic AlCare TK-AS500
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EN12
Steps to take before operation
Installation 1
Check the main
unit and supplied
accessories
P. EN13
Installation 2
Check the shape
of faucet
P. EN14
Installation 3
Attach the bypass
selector
The attaching method
di󰀨ers depending on
the shape of faucet.
P. EN15
P. EN17
Installation 4
Install the Alkaline
Ionizer
P. EN18
P. EN19
17 cm or more
9.5 cm or more
Installation 5
Check after
installation
The air in the main
unit is not completely
exhausted, please drain
alkaline ion water for
about 3 to 4 minutes.
P. EN20
P. EN21
Installation 6
Measure and
adjust the pH level
of water
P. EN22
P. EN23

Related product manuals