English
18/20
ICEP080E-ICEP120E
5.3 Preventive Maintenance Programme
To guarantee lasting maximum chiller effi ciency and reliability:
Maintenance
Activity Description
Maintenance Interval
(standard operating conditions)
Activity
Check
Service
Daily
6 Months
12 Months
36 Months
Check POWER ON indicator is lit.
Check control panel indicators
Clean condenser fi ns.
Check electrical absorption
Check refrigerant leaks
Clean safety valve (if present)
Check temperature sensors
Replace if necessary
Maintenance kit
Z The following are available (see par 7.):
a) service kit:
• electric kit
• compressor kit;
• fan kit;
• expansion valve kit;
• evaporator;
• water tank kit;
b) individual spare parts.
5.4 Dismantling
The refrigerant and the lubricating oil contained in the circuit must be recovered in conformity with
current local environmental regulations.
The refrigerant fl uid is recovered before fi nal scrapping of the equipment ((EU) No. 517/2014 art.8).
% Recycling Disposal Z
frame and panels steel/epoxy resin polyester
tank aluminium/copper/steel
pipes/collectors copper/aluminium/carbon steel
pipe insulation NBR rubber
compressor steel/copper/aluminium/oil
condensator steel/copper/aluminium
pump steel/cast iron/brass
fan aluminium
refrigerant R513A
valve brass/copper
electrical cable copper/PVC
Equipment containing electrical components must be disposed separately
collected with electrical and electronic waste according to local and currently
legislation.