Installer manual Autotrol 368 (604-606) - Programming
Ref. MKT-IM-007 / D - 09.10.2020 35 / 60
1. Press until desired capacity appears then release.
ð Range from 0.4 to 9.5m
3
;
from 0.4m
3
to 1.0m
3
by increments of 0.05m
3
(12increments);
from 1.0m
3
to 3.0m
3
by increments of 0.1m
3
(20increments);
from 3.0m
3
to 5.0m
3
by increments of 0.2m
3
(10increments);
from 5.0m
3
to 9.5m
3
by increments of 0.5 m
3
(10increments).
6.8 Calendar override setting (606only)
The 606controller needs a method to set days between regeneration for regulatory requirements
and in cases when the flow sensor has failed.
1. Press and hold and for 3seconds.
ð The programmed calendar override is displayed.
2. Press to increases value.
ð Range from 0 through 30;
0= Disabled;
0.3 = Regeneration every 8hours: at 2, 10 and 18hours;
0.5= Regeneration every 12hours: at 2 and 14hours;
1– 30= Regeneration every Xdays (every 3days in this
example).
6.9 System selection
The 604/606 controller has four system settings available. The system selections accommodate
multiple tank sizes and various feedwater conditions.
System selection:
1. Press and hold and simultaneously for 3seconds.
ð A small “u” will be displayed in the left digit.
ð The right digit will display the current system setting.
2. Press until desired system setting appears then release.
ð The displayed system setting will be stored in flash
memory when the controller exits programming after
5seconds.
6.9.1 Programmed settings
C# Cycle Resin bed
flow
direction
System u1
[minutes]
System u2
[minutes]
System u3
[minutes]
System u4
[minutes]
C1 Backwash ↑ 8 8 1 3