EasyManua.ls Logo

Pentair Fleck 4600-MECH - Set the Number of Days between Two Regenerations

Pentair Fleck 4600-MECH
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installer Manual Fleck 4600 - MECH - Programming
Ref. MKT-IM-027 / B - 01.06.2018 49 / 88
6.3.2. Set the number of days between two regenerations
No. Operation
A Push the pins (1) out to set up.
Note
There are two time clock wheels:
7 days: based on the week, number 1 will refer to Monday, number 7 to Sunday;
12 days: allows to set a regular interval every 2, 3, 4 or 6 days.
Note
Example for the following drawing, the regeneration will occurs on Monday and Thursday.

Table of Contents

Related product manuals