Set-up and Initial Commissioning
23
8.03 Initial start-up
Inspect the machine and in particular the
electric lines and pneumatic connecting
hoses for possible damage.
Remove the stopper 1 from the oil tank
2. The stopper serves solely for transit
support and may not be used during the
sewing operations.
Clean the machine thoroughly and then
oil it, see Chapter 10 Maintenance and
Care.
Have technical staff check whether the
machine’s motor may be operated at the
existing mains voltage.
Never operate the machine if there are any differences.
Before the initial commissioning, have technical staff verify that parameter 201
(machine class) is set to “1”.
The machine must only be connected to a grounded socket!
Connect the machine to the compressed air system. The manometer should display a
pressure of around 6 bar. Set this value, if possible (see Chapter 10.04 Monitoring/adjust-
ing air pressure).
8.04 Switching the machine on/off
Switch the machine on, see Chapter 7.01 Main switch.