EasyManua.ls Logo

Philips Optimus - 8. Tube Check with Rotor Control Part 1

Philips Optimus
53 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8 TUBE CHECK WITH ROTOR CONTROL PART 1
In case the tube was rotating during tripping of mains breakers the CPU remembers that the brake process has
not been carried out (high-speed rotor control only).
About 40 seconds after switch-ON the tube brakes.
NOTE
If the anode disk is not rotating before switch-ON it sounds like an acceleration
process.
Switch ON the generator and perform an audible check at the tube housing during the generator start-up
(for further explanations see chapter 10.)
As the mains lines are not connected to the converters, error messages 02HI and 02HJ come up
(converter DC is 0V, therefore out of range).
Converter test kit OPTIMUS for OPTIMUS 50/65/80 gen‐
erators release 3.x with converters 4512 104 7231x
18 CSIP Level 1 (08.0)
© 2008 Koninklijke Philips Electronics N.V.
ALL RIGHTS RESERVED
Conv test Optimus

Table of Contents

Related product manuals