EasyManua.ls Logo

Pilz PSS 3075-3 Series - Page 37

Pilz PSS 3075-3 Series
98 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating Manual: PSS 3075-3 Series
4-5
The output power-up tests are a component part of the system’s self
check. The self check is carried out when voltage is returned, on start up
(transfer from STOP-RUN) and also during operation.
Operating system call SB255, function 2 in OB120 is required to
deactivate the power-up test on start up. To deactivate the power up-test
during operation, the operating system call must be contained in a block
that is run as part of each cycle. The power-up test will be performed
again as soon as the operating system call is no longer present.
NOTICE
Each time SB255, function 2 is called, data words DW200, DW201 and
DW202 must be written in full to ensure that outputs are not excluded from
the power-up test unintentionally, due to data words being unwittingly
overwritten during the program cycle.

Table of Contents

Related product manuals