! Plexxi Switch 3eq Installation Guide (Switch-Control 3.0.0-3.2.x)! 9!
1 Checklist!
Pre-staging
! Verify site requirements, including:
! Verify that redundant site power is available
! Verify rack air flow
! Unpack the switches
! Verify equipment delivered
! Record the MAC address of the switch
!
Determine the type of LightRail you will install
!
LightRail 3 (100 Gb/s per link)
!
LightRail 2 (25 Gb/s per link)
! Form a cabling plan and verify cable lengths
Installation
! Install the switches in racks
! Install power cables. The switch automatically powers up and boots. Verify green LEDs.
!
Connect a console system to the CONSOLE port of the switch.
! Install the
LightRailâ„¢ fabric cables and b
uild the Plexxi fabric using either:
! PSI interconnect, or
! Direct connect
! Configure the LightRail as described in the appropriate release of the document, Plexxi Switch
Administrator Guide using Linux and Plexxi CLI
! Perform the initial switch configuration as described in the appropriate release of the document,
Plexxi Switch Administrator Guide using Linux and Plexxi CLI
! Connect servers to access ports