EasyManua.ls Logo

Posch SplitMaster 30 - Set-Up

Posch SplitMaster 30
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Safety lock - lifting device
Z2001360
Oil level
Z205 0010
Phase inverter
Fuel: Diesel
Z2050400
Lubrication point
Stickers on controls
Z205 0865
Operation - lifting device and knife adjustment
Z2050871
Operation - splitter
Stickers on travel gear
Z2050330
max. 3,5 bar
Tyre pressure
Set-up
Ensure the machine is stable before starting it.
Set up the machine on a level, firm and clear work surface.
The machine must be placed directly on the ground. Do not place wooden boards, flat pieces
of metal etc. underneath it.
The machine must not be set up under an overhead electrical power line.
3.5
General
14

Related product manuals