Page 14 of 80 Instruction Manual for AURORA CDD BCG.00613_AA
Part 2 Unpack and Select Installation Location
2.1 GENERAL CONDITIONS
Some recommendations apply only to large size products or multiple small size packaging.
2.1.1 TRANSPORT AND HANDLING
Transportation of the equipment, especially by road, must be carried out by suitable ways and
means for protecting the components (in particular, the electronic components) from violent
shocks, humidity, vibration
,
etc
.
2.1.2 INCOMING INSPECTION
It is the customer’s responsibility to examine the condition of the unit shipped. Upon receipt of
AURORA CDD, please perform the following check:
• Inspect the shipping container for any external damage.
• Inventory the contents against the listing below and verify receipt of all items. Use care not
to discard any equipment, parts, or manuals.
• Call the delivering carrier if damage or shortage is detected.
If inspection reveals damage to the inverter, contact the supplier, or authorized distributor for a
repair/return determination and instructions regarding the process.
Table 2-1: List of Components Supplied
Bolts M5x30 and countersunk screws for wall
mounting
Plug-in power feeder (input 100...240 Vac; 50/60 Hz, output 5 Vdc - 1A)
with interchangeable plugs