EasyManua.ls Logo

Precor C956 - Page 12

Precor C956
53 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
-------------------------------------
COMMERCIAL
PRO
D U C T S
DIVISION
Diagram 5
Diagram 6
page
12
Remove the
shipping
fasteners from
the left side front
panel.
Shipping
fasteners found
-+-----'''---\\---'!<-2'111.
on left and right
sides of the front
panel.
Left side
mounting
bracket
----+--_B_-+----
J
5.
Attach the left side upright support. Diagram 5. Take the following steps.
a. Remove the shipping fasteners from the front panel. With the supplied hex
key and a
Y2-inch
box end wrench, loosen and remove the two bolts, washers
and nuts on the left side of the front panel. These fasteners hold the front
panel in place during shipping. (The front panel will drop slightly when you
remove the fasteners.) Discard the nuts, but keep the bolts and washers.
Secure the left II
upright support.
Screws (D),
--I--------f----+--+
washers (E),
and barrel
spacers (F)
Left upright
support
----+----t---r
b.
Attach the left upright support by placing it inside the base
mount
and
aligning the mounting holes. Obtain two bolts, washers
and
barrel spacers
from the Hardware kit. Place a washer and barrel sleeve on each bolt and
insert the fasteners through the side of the upright support
and
into the
base mounts. Use the 1/4-inch hex key to secure the bolts, but leave room
for adjustments. See Diagram 6, #1.
c. Reinsert the two shipping fasteners (bolts
and
washers
only) removed in
step 5a, and finger tighten.
See
Diagram 6, #2.

Table of Contents

Other manuals for Precor C956

Related product manuals