12
Revision 01/2019 EN
PowerLossMonitor PLM
5 Transport
NOTICE
Damaging/destroying the device
Hard hits or falls may damage the device.
X
Handle the device carefully when transporting it.
X
Only transport the device in the original PRIMES transport box.
NOTICE
Damage/destruction of the device caused by leaking or freezing cooling water
Leaking cooling water can damage the device. Transporting the device at temperatures near
or below freezing and without emptying the cooling circuit completely can damage the
device.
X
Empty the lines of the cooling circuit completely.
X
Even when the lines of the cooling circuit have been emptied, a small amount of residual
water will remain in the device at all times. This may leak out and end up inside the device.
Close the connector plug of the cooling circuit with the included sealing plug.
NOTICE
Damaging/Destruction of the flow rate meter
The flow rate meter is not designated for high rotational speed.
X
Do not use compressed air for emptying the cooling circuit.
6 Installing the software
For the operation of a PowerLossMonitor PLM with a PC, the PRIMES PowerMonitorSoftware has to be
installed. Start the installation by double-clicking the file “PMS v.2.xx Setup” and follow the instructions on
your screen.