EasyManua.ls Logo

ProSun V3 - Installation Safety and Electrical Requirements; Authorized Personnel and Responsibilities; Electrical Wiring and Compliance

ProSun V3
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
MARK76V3002 Rev 3
Installation can present a Danger with electrical shock or burns, only authorized personnel
shouldinstalltheequipment.InitialinstallationshouldbedonebyaProSuncertied
technician. As the equipment owner it is your responsibility to ensure that correct electrical
requirements are met and followed.
Overheating can occur if proper ventilation is not followed. Never obstruct the airways in the
inowandoutowareas.Ifproperventillationisnotfollowedsystemmalfunctionanddamage
mayoccur.Alwaysinstalltheunitatproperdistancefromwallsinordertohaveproperairow.
Failure to do so may cause system failures or errors.
The customer is responsible for all costs associated with the preparation of the installation
of the equipment. This includes but is not limited to room preparation, costs, fees, permits,
andinspectionsunlessspeciedotherwiseinthesalesorderfortheequipmentpurchased.
ProSun and all authorized parties shall reserve the right to refuse to install equipment into any
roomwhichhasnotbeenproperlypreparedinaccordancewiththeelectricalspecicationand
room requirements.
The electrical contractor or his designee shall provide and install all electrical material as
speciedforasafeoperatingsystem.ProSuncertiedtechnicianswillnotperformany
electrical work. The recommended electrical plan must be coordinated between the customer
and the electrical contactor. Any deviation of the electrical, before, during and after equipment
installation is the responsibility of the customer. The electrical contractor or his designee shall
ensure the completion of all electrical requirements prior to the installation of any ProSun
equipment. All wires shall be single solid runs without splices, meeting NEMA standards.
The electrical contractor or his designee should ring out, tag and terminate all wires at both
ends. Each should be inspected to ensure that no wires have been grounded or are left
open.ProSuncertiedtechniciansarenotresponsibleforthenalinstallationoftheelectrical
system,theelectricalcontractororhisdesigneeshouldbepresenttomakethenalelectrical
connection upon completion of the installation of the equipment.
The customer shall bear the sole responsibility for compliance with all applicable codes,
OSHA, NEMA, local and national Standards. All electrical work shall conform to the
requirements of the national electrical code, OSHA or applicable local and or state
ordinances.
WARNING: Position the equipment so that disconnection to the mains circuit breaker can be
easily made during the unexpected error which could lead to a hazardous situation.
WARNING: PowersupplycordmustbereplacedbyProSuncertiedtechnician.
DANGER!
WARNING!

Table of Contents

Related product manuals