Chapter 4 - INSTALLATION AND TESTING INFORMATION
RC GROUP S.p.A I_TRP_0909_GB
28
ELECTRIC BOARD INLETS / OUTLETS
4.11 PRE-COMMISSIONING PROCEDURES
Before contacting the specialized Engineer who will execute the
commissioning for testing, the Installer must carefully check that the
installation conforms to the requirements and specifications laid-down
during the design stage, making sure:
- that the electrical connection is correct;
- that the hydraulic connection is ended correctly;
- that the plumbing is filled with liquid under pressure;
- that pumping systems are working;
- that all shutoff valves are open.
Power supply 400/3/50+N
Working mode selector Summer / Winter
Working mode enabling Summer / Winter
Domestic water enabling
Chilled / hot water flow switch
Domestic water flow switch
INLETS
General alarm 2
OUTLETS
General alarm 1