6.13 PROLONGED SHUTDOWNS OF THE MACHINE
If the machine must remain off-duty for a long time (e.g. seasonal
shutdown), the specialized Engineer must:
check the pressure vessels’ state of preservation
conduct the leak test on the system
open the line isolator
close the chilled water shutoff valves
drain the chilled water from the piping of the hydraulic circuits,.
6.14 START-UP AFTER PROLONGED SHUTDOWN
Before starting the machine, carry out all the maintenance jobs indicated
§ 7.2.
Moreover, the specialized Engineer must carry out adequate checks,
calibrations and the start-up procedure.