EasyManua.ls Logo

Red Jacket Quick-Set P75S1T2 - Page 44

Default Icon
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4” Standard Pump Installation, Operation & Service Manual Installing a Replacement Extractable Pump
39
25. Torque the conduit box bolts to 30 - 45 ft-lb (40 - 61 N•m).
NOTE: suggested tools (non-sparking) include a 3/4'' wrench, pipe wrench, 1/4” allen wrench, 9/16” wrench,
screw driver, wire cutter and wire stripper.
26. If applicable, open ball valve down line from the pump.
27. After the installation is completed and tests have been made, purge system of air by pumping at least 15
gallons (57 liters) through each dispenser. Begin with the dispenser furthest from the pump and work toward
the pump.

Related product manuals