Installation site requirements
© robatherm 13
Footprint requirements
AHUs have the following footprint requirements:
Fig. 2: AHU footprint requirements
A - revision area; B - unit width; C ≥ 875 mm; D ≥ 500 mm
• Leave ≥ 875 mm (C) free for connections and escape routes on all sides of the AHU.
• To replace components (e.g., coil, filter wall I - O, fan) on the operating side, leave one unit
width (B) free as a revision area (A).
• Leave ≥ 500 mm (D) free above the AHU as a revision area (A).
Steam generator for electro steam humidifier
For steam generators for electro steam humidifiers, observe the minimum wall clearance according to
the manufacturer.