Directory
88 © robatherm
Fig. 39: A – supporting rod 31
Fig. 40: A - supporting rod; C - support point 31
Fig. 41: A - supporting rod ; D - spacer tube 31
Fig. 42: Hinge of the door 32
Fig. 43: External lock with key size 10 / double-bit 3 32
Fig. 44: Pressure curve in the AHU 34
Fig. 45: Airflows in the combine unit 35
Fig. 46: Underpressure siphon 36
Fig. 47: Overpressure siphon 37
Fig. 48: Connecting several pan drains 38
Fig. 49: Wrong connection 38
Fig. 50: Separation point before 39
Fig. 51: Separation point after 39
Fig. 52: Disassemble transport lugs 41
Fig. 53: Sealing holes 41
Fig. 54: Cleaning 41
Fig. 55: Drying 41
Fig. 56: Fitting drip edge overlapping part 42
Fig. 57: Mounting drip edge overlapping part 42
Fig. 58: Installation temperature 42
Fig. 59: Preheating 42
Fig. 60: Cutting roofing membrane stripes to size 43
Fig. 61: Applying roofing membrane stripes 43
Fig. 62: Apply solvent-welding agent in sections 43
Fig. 63: Applying solvent-welding agent 43
Fig. 64: Pressing 44
Fig. 65: Weighing down 44
Fig. 66: Sealing paste 44
Fig. 67: Roof sealing at the separation point 44
Fig. 68: Disassembling transport lug 45
Fig. 69: Close hole 45
Fig. 70: Cleaning 45
Fig. 71: Drying 45
Fig. 72: Installation temperature 46
Fig. 73: Preheating 46
Fig. 74: Cutting roofing membrane stripes to size 46
Fig. 75: Applying solvent-welding agent 46
Fig. 76: Applying roofing membrane stripes 47
Fig. 77: Pressing 47