Directory
© robatherm 89
Fig. 78: Weighing down 47
Fig. 79: Sealing paste 47
Fig. 80: Roof sealing at the corner 48
Fig. 81: Mounted lower AHU with main frame 49
Fig. 82: Additional frame 49
Fig. 83: Install material 49
Fig. 84: Placing additional frame 50
Fig. 85: Joining additional frame 50
Fig. 86: Detail of the additional frame screw fitting 50
Fig. 87: Mounted additional frame 50
Fig. 88: Placing additional frame 51
Fig. 89: Joining additional frame 51
Fig. 90: Detail of the additional frame screw fitting 51
Fig. 91: Mounted additional frame 51
Fig. 92: Scope of delivery, protection roof 52
Fig. 93: Taping 52
Fig. 94: Insert screws first 52
Fig. 95: Removing screws 53
Fig. 96: Screws have been removed 53
Fig. 97: Alignment 53
Fig. 98: Fit screws 53
Fig. 99: Screws fitted 54
Fig. 100: Remove transport lugs 54
Fig. 101: Sealing holes 54
Fig. 102: The protection roof is mounted 54
Fig. 103: F - rivet nut M8, hexagonal, V2A; G - filter wall 55
Fig. 104: Install material 56
Fig. 105: Assembly sequence 56
Fig. 106: Mounting threaded bolts 56
Fig. 107: Placing the filter 57
Fig. 108: Aligning the filter 57
Fig. 109: Sliding clamping profiles on 57
Fig. 110: Incorrect orientation of clamping profiles 57
Fig. 111: Screw on washer and nut 58
Fig. 112: Incorrect orientation of clamping profiles 58
Fig. 113: Tightening torque 2 Nm 58
Fig. 114: Incorrect orientation of clamping profiles 58
Fig. 115: Mounted filter 59
Fig. 116: Transport lock 61