10-3
ASSEMBLY
PROCEDURES
10-3-1
FRONT
COVER
Attach the front cover to the engine main bearing
cover. Match the faucet joint and tighten the bolts.
M8
x
20
mm bolt
. .
-4
pcs.
M8
spring washer
-
.
.4
pcs.
120
-
140
kg-crn
8.7
-
10.1 fGlb
~~~ ~
10-3-2
ROTOR
(1)
Wipe off oil, grease and dust from the tapered
portion
of
engine shaft and.matching tapered
hole of rotor shaft.
(2)
Mount the rotor to the engine shaft. Tighten
the through
bolt.
Apply
a wrench on the through
bolt and hit wrench handle clockwise with a
hammer to tighten.
If
an impact wrench is
available, use
it.
Tightening torque
:
113
-
132
N-m
RGV2800
115
-
135
kgcrn
8.7
-
10.8
ft-lb
RGV4100
RGV6100
22.5
-
245
N-m
230
-
250
kgtm
16.6
-
19.5 ft-lb
I
Fig.
1027
Fig.
10-22
-
46-