Rockwell Automation Publication 750-QS100B-EN-P - August 2020 7
Step 1: Gather the Required Information
When you apply power to your drive for the first time, you must enter specific information about your application. This
step helps you to verify that you have the needed information before drive power-up.
Tab l e 1 o n pa g e 8
provides a place to record the data you need for the rest of the steps in this document.