EasyManua.ls Logo

Rohde & Schwarz R&S SMB100B - Mounting the R&S SMB100 B in a Rack

Rohde & Schwarz R&S SMB100B
67 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preparing for use
R&S
®
SMB100B
22Getting Started 1422.1045.02 ─ 06
4.4.2 Mounting the R&S SMB100B in a rack
To prepare the rack
1. Observe the requirements and instructions in "Setting up the product"
on page 8.
2. NOTICE! Insufficient airflow can cause overheating and damage the product.
Design and implement an efficient ventilation concept for the rack.
To mount the R&S SMB100B in a rack
1. Use an adapter kit that fits the dimensions of the R&S SMB100B to prepare
the instrument for rack mounting.
a) Order the rack adapter kit designed for the R&S SMB100B. For the order
number, see the data sheet.
b) Mount the adapter kit. Follow the assembly instructions provided with the
adapter kit.
2. Lift the R&S SMB100B to shelf height.
3. Grab the handles at the front.
4. Push the R&S SMB100B onto the shelf until the rack brackets fit closely to the
rack.
5. Tighten all screws at the rack brackets with a tightening torque of 1.2 Nm to
secure the R&S SMB100B in the rack.
To unmount the R&S SMB100B from a rack
1. Loosen the screws at the rack brackets.
2. Bring the lifting equipment to shelf height.
3. Remove the R&S SMB100B from the rack.
4. If placing the R&S SMB100B on a bench top again, unmount the adapter kit
from the R&S SMB100B. Follow the instructions provided with the adapter kit.
Setting up the R&S SMB100B

Table of Contents

Other manuals for Rohde & Schwarz R&S SMB100B

Related product manuals