Hardware Installation and Reference Guide Product Installation
45
3 Product Installation
Please ensure that you have carefully read Chapter 2 and make sure that the requirements set
forth in Chapter 2 have been met.
3.1 Installation Flowchart
3.2 Pre-installation Confirmation
Before installation, please confirm the following points:
Whether sufficient airflow is available for the switch
Whether the requirements of the switch for temperature and humidity are met
Whether power cables are already laid out and whether the requirements of electrical current are
met
Whether related network cables are already laid out