Index revision : C - November 2017 27 7030
4.8. Colour change and rinsing cycles
Example of atomizer integration
• Standard conditions: 6 bar, air, solvent and paint.
• Colour change block and rinsing block operated 1 to 1.5 metres away from atomizer.