EasyManua.ls Logo

Scania 2.1 - Introduction; Responsibility; Display languages

Scania 2.1
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPM 520 en-GB 3
© Scania CV AB 2018, Sweden
Introduction
Introduction
This Operator's manual describes the operation
of Scania instrumentation.
The information in this manual was correct at the
time of going to press. Scania reserves the right
to make alterations without prior notice.
Note:
Always use Scania spare parts for maintenance
and repair.
REQUIREMENT!
Work on the low voltage circuit should only be
carried out by qualified and experienced person-
nel.
Work on the high voltage circuit may only be
carried out by an authorised electrician.
Responsibility
It is the responsibility of the installer to ensure
that the installation of the electrical system is
carried out in a professional manner. It is also the
responsibility of the installer to ensure that the
system is working satisfactorily and that all com-
ponent parts meet legal requirements and regula-
tions.
Display languages
In this Operator's manual the display interfaces
are shown in English. It is however possible to
set other languages.