EasyManua.ls Logo

SCHUNK GSM-P - Page 31

SCHUNK GSM-P
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Assembly
14.00 | GSM-P | Assembly and Operating Manual | en | 389104 31
l
The left rotating angle end position is always reached when a
switching point of the sensor of the left groove (SGL1 or SGL2)
is active.
l
The right rotating angle end position is always reached when
a switching point of the sensor of the right groove (SGR1 or
SGR2) is active.
The sequence of rotating and closing movements (process
sequence) defined during the teaching procedure must not be
changed during operation. Otherwise, incorrect sensor signals
may be output.
With many GSM variants, it is possible to combine magnetic
switch monitoring with inductive monitoring, }5.3.6 [/32].
l
If you require further information on sensor operation,
contact your SCHUNK contact person or download information
from our homepage.
l
Technical data for the sensors can be found in the data sheets
(included in the scope of delivery).

Table of Contents

Related product manuals