9QB2000 9.2022 vers 1.0
Tool Kit
Suggested tools for your tool kit are:
Phillips screwdrivers
Adjustable pliers
Needle Nose pliers
Socket Set including 5.5 mm, 7 mm and 10 mm
Leg Levelers
Leg Levelers have been provided in your parts pack as it is essenal for proper operaon to have a level
vending machine. Installaon requires two people; one to slightly lt the machine while the other installs the
leveler by screwing it into the base of the machine on all four corners.
Note: Care should be taken not to p the vending machine more than a few degrees. Excessive pping of the
machine can ruin your refrigeraon system and void your warranty.
Installing the MT970
1. Remove all shipment/packing materials, inspect unit for damage.
2. Place the Entrée Unit on the right side of the main unit and open the front door. Align the mounng
holes on the inside of the unit with the holes in the main unit. Using the bolts and washers provided,
(2 each) aach the Entree Unit to the main unit (Fig. 3).\
Figure 3 – Auxiliary Unit Bolts
Aach with
provided bolts
and washers
3. Disconnect power from Main Unit.
4. Connect Wire Harness from the Entree Unit to the Main Unit. (Figure 4)
5. Reconnect power to Main Unit.