5. Re-hang the meter from the top mounting screw, and then fit the bottom mounting screws.
Two pairs of mounting holes are provided adjacent to the terminal
block from which any pair can be used for fixing the meter. These
are visible on the front after removing the terminal block cover.
Refer to the section Selecting Suitable Mounting Screws for more
details.
4.7.3 Preparing cables for termination
1. Ensure that a cable of the correct rating is being used. If a cable of lower rating is used, replace it with
appropriate cable.
2. Strip the insulation of cables used as per given recommendations. Following table shows the internal
bore diameters of all the terminals.
Table 5: Sprint 211 Internal Bore Diameters
S. No Meter terminal type Internal bore
diameter (in mm)
Depth of terminal
hole (in mm)
Main Supply & Load Terminals (1S,
2S, 3S, 1L, 2L, 3L, NS, NL
11 29
Load Control Terminals 6.5 20
3. Check the condition of the cable. If the cable is corroded or oxidized, replace the entire cable.
4. If cable was already stripped for a previous installation, cut the previous stripped length. Re-prepare
the cable termination.
5. Loosen the terminal screws and insert one cable core into the terminal cage.
6. Ensure that at least 5 mm of the insulated part of the cable core is inserted into the terminal box
shroud. If the cable insulation is thick enough to be inserted into the shroud, strip an extra length of
5.00 mm and insulate this extra length with a standard insulation tape to prevent exposed conductor at
terminal end. Terminal block shroud will work as an insulation sleeve.
7. Prepare each core in the same manner for supply as well as load side.
Page 24 of 48 Sprint 211 Installation Manual BGX701-160-R01