15. 31.5 Ampere load contactor (variant specific)- This is provided in Sprint 211 to support basic load control
functions such as load switch actions, switch time randomisation and load cycling.
16. Phase Selection Sockets – Either of phases i.e. A, B or C can be used to energise the auxiliary load
connected to L1 with the help of a phase selection provision provided on Sprint 211’s terminal block. This is
done by tightening the screw provided in any ONE of the phase selection sockets above each phase.
CAUTION – DO NOT connect the auxiliary load in parallel to more than one phase at a time. This will lead to a
short circuit. For a given meter installation, the auxiliary load can be connected to only one phase. This is a
variant specific feature.
2.2 Information printed on Sprint 211 front cover
Figure 3: Information on the Sprint 211 front cover
trademark
meter serial
number
number
control variant
Rated operating voltage
Current rating
Class index, Frequency
Temperature
BGX701-160-R01
Sprint 211 Installation Manual Page 11 of 48