• No evidence of external damage or missing parts
• No missing or damaged wiring
• No evidence of overheating
Ideally the meter should be stored and operated in a dry, well ventilated, climate-controlled building. Rapid
changes in temperature and humidity should be avoided.
3.4 Standards and external certification
The Sprint 211 meter with internal communication module conforms to the following standards:
Table 1: Standards
3.5 Connection terminals
The following diagram shows the internal connection for two build types of the Sprint 211.
3.5.1 Connection diagram, with disconnect and LC
3.5.2 Connection diagram, with disconnect and without LC
BGX701-160-R01
Sprint 211 Installation Manual Page 15 of 48