vii
TABLE OF CONTENTS
INTRODUCTION iii
1 HANDLING PRECAUTIONS 1
2 PRECAUTIONS REGARDING INSTALLATION 4
3 PRECAUTIONS REGARDING OPERATION 7
4 PART DESCRIPTIONS 10
5 ACCESSORIES 11
6 ASSEMBLY AND INSTALLATION 13
6-1 INSTALLING THE CABINET 14
6-2 FIXATION TO SITE 22
6-3 POWER SUPPLY AND OTHER CONNECTIONS 24
6-4 TURNING ON THE POWER 25
7 PRECAUTIONS WHEN MOVING THE MACHINE 27
7-1 PRECAUTIONS WHEN MOVING FROM SITE 28
9 EXPLANATION OF TEST AND DATA DISPLAY 31
9-1 SWITCH UNIT AND COIN METER. 32
9-2 TEST MENU 32
10 CONTROLLER UNIT(S) 44
10-1 AJUSTING/CHANGING THE POT 45
10-2 GREASING 49
11 FEATURE REEL / TRACKER 50
12 COIN HANDLING 54
12-1 CLEANING THE COIN SELECTOR 54
12-2 FAULT FINDING 57
12-3 ADJUSTING THE PRICE OF PLAY (EXCEL) 58
13 LAMPS AND LIGHTING 62
13-1 REPLACING THE COIN DOOR LAMP 62
13-2 REPLACING THE LADDER / WINLINE LED’s 63
13-3 REPLACING THE 5 DIGIT NUMERIC DISPLAY 65
13-4 REPLACING THE LED (WHT) SNAKE BODY 67
13-5 REPLACING THE LED (WHT) FEATURE REEL / TRACKER 69
13-6 REPLACING THE LED (RGB) PULL 71
14 PERIODIC INSPECTION 72
15 TROUBLESHOOTING 74
11-1
TROUBLESHOOTING (WHEN NO ERROR MESSAGE IS SHOWN) 74