EasyManua.ls Logo

Sega Snakes & Ladders - Table of Contents

Sega Snakes & Ladders
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
vii
TABLE OF CONTENTS
INTRODUCTION iii
1 HANDLING PRECAUTIONS 1
2 PRECAUTIONS REGARDING INSTALLATION 4
3 PRECAUTIONS REGARDING OPERATION 7
4 PART DESCRIPTIONS 10
5 ACCESSORIES 11
6 ASSEMBLY AND INSTALLATION 13
6-1 INSTALLING THE CABINET 14
6-2 FIXATION TO SITE 22
6-3 POWER SUPPLY AND OTHER CONNECTIONS 24
6-4 TURNING ON THE POWER 25
7 PRECAUTIONS WHEN MOVING THE MACHINE 27
7-1 PRECAUTIONS WHEN MOVING FROM SITE 28
9 EXPLANATION OF TEST AND DATA DISPLAY 31
9-1 SWITCH UNIT AND COIN METER. 32
9-2 TEST MENU 32
10 CONTROLLER UNIT(S) 44
10-1 AJUSTING/CHANGING THE POT 45
10-2 GREASING 49
11 FEATURE REEL / TRACKER 50
12 COIN HANDLING 54
12-1 CLEANING THE COIN SELECTOR 54
12-2 FAULT FINDING 57
12-3 ADJUSTING THE PRICE OF PLAY (EXCEL) 58
13 LAMPS AND LIGHTING 62
13-1 REPLACING THE COIN DOOR LAMP 62
13-2 REPLACING THE LADDER / WINLINE LED’s 63
13-3 REPLACING THE 5 DIGIT NUMERIC DISPLAY 65
13-4 REPLACING THE LED (WHT) SNAKE BODY 67
13-5 REPLACING THE LED (WHT) FEATURE REEL / TRACKER 69
13-6 REPLACING THE LED (RGB) PULL 71
14 PERIODIC INSPECTION 72
15 TROUBLESHOOTING 74
11-1
TROUBLESHOOTING (WHEN NO ERROR MESSAGE IS SHOWN) 74

Related product manuals