EasyManua.ls Logo

SENEC Wallbox pro s - Load Management (Optional)

SENEC Wallbox pro s
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
English
29
Checkwhetherthechargingcableisplugged
into the vehicle correctly.
Afteraself-testhasbeenperformedandthefault
has been corrected, the front illumination lights up
white. The vehicle can request the charging process.
Six white ashes, pause, six rapid blue ashes,
pause (Fig. XIV no. 7)
InternalfaultintheWallbox.
Unplug the charging cable from the vehicle.
DisconnecttheWallboxfromthepowersupply
byswitchingofftherespectivecircuitbreakers
inthebuilding.Waitapprox.1minuteandthen
switchthecircuitbreakerbackon.
Re-connect the charging cable to the vehicle.
Afteraself-testhasbeenperformedandthefault
has been corrected, the front illumination lights up
white. The vehicle can request the charging process.
Troubleshooting
If one of the faults listed persists, please contact our
CustomerSupportteam.
2.2.3 Load management (optional)
TheSENEC.Wallboxproscanbeoperatedwith
aloadmanagementsystem.Thisenablesthe
Wallboxtooperateinvariousmodessuchas:
OperationofseveralWallboxesinanintegrated
networkwithmonitoredpowerdistribution(load
management).
OperationoftheWallboxwithdifferentenergy
sources such as solar energy or the normal
electrical mains.
Moreinformationisavailableon-line,intheinstruc-
tions“SENEC.Wallboxpros,LocalLoadManage-
mentandExternalLoadManagement”:
mein-senec.de>Downloads

Table of Contents