Operating Instructions – MOVIDRIVE
®
modular
158
5.4.1 Check list for startup
The following checklist lists the necessary steps for complete startup.
Step Startup step Done
1 Motor installation
2 Install MOVI‑C
®
component
3 Start MOVISUITE
®
4 Start up the drive train
5 Parameterize setpoints and FCBs
6 Configure digital inputs and outputs
7 Configure PD
8 Configure software module (MOVIKIT
®
)
9 Test drives/application
5.5 Connection to the engineering software
The following figure shows the connection of the application inverter to the
MOVISUITE
®
engineering software using a PC.
[1]
RUN ERR
X15
X21 X20 X31
S1
S2
+UZ
-UZ
X4
+UZ-UZ
24V
X5
+UZ
X4
-UZ
-UZ +UZ
GND
X31X20_1X21_1
X20_2X21_2
X15_1
X15_2
S1
S2
RUN ERR
+UZ
X4
X5
24V
GND
-UZ
+ UZ- UZ
X4 0
US 1
BF
X8 5
S3
T1
L1
L/ A
X8 0
L2
L3
L4
XM
L5
L6
L/ A
X4 1
L/ A
UHX 45 A- N
18014413831237515
[1] Ethernet
24748536/EN – 11/2017