19Installation manual – NewMotion Home Advanced 2.1 / 2.2 - 071NMEN13
5 . 4 . 2 . Pavement mount
u i o
1 . Place the pole on the pavement and mark the locations for the holes (see gure 16 ).
2 . Remove the pole and drill holes into the pavement for the wedge bolts or chemical anchors.
NOTICE Check the fastener package for the correct diameter and depth.
3 . Secure the fasteners into the holes. Allow the chemical anchor to dry, if applicable.
4 . Feed the power cable and optional data cable(s) through the pole (see gure 17 ).
5 . Secure the pole to the fasteners using 4 washers and nuts (not provided) (see gure 18 ).
6 . Remove any excess threaded rod, if necessary.
T20
Ø10 - 13 mm
Ø13 - 15.5 mm
Ø15.5 - 18 mm
Ø18 - 21 mm
Ø21 - 22.5 mm
p
7 . Remove the rear cable clamp (see gure 191 ).
8 . Insert the coloured grommet matching the power cable thickness into the rear input hole (see gure 192 ).
NOTICE Use a caliper to measure the thickness of the power cable and determine the correct coloured grommet.
EN