MCS100E HW Maintenance Manual 8009624/2009-09 (V1.4) ©SICKMAIHAKGmbH 9
Maintenance Interval
2.3
Maintenance intervals
Maintenance work Reference W
1
1
W = weekly, M = monthly, Q = quarterly, H = half yearly
M
1
Q
1
H
1
Visual inspection
Visual check of system cabinet
→
P. 12, § 3.1 xx
Check if measured values are plausible in the control
room
--- x x x x
Check if sample gas flow rates are plausible on the
MCS100E display, write data into log file
→
P. 12, § 3.2 xx
Gas sampling probe
Replace the fine filter cartridge and filter seals
→
P. 19, § 3.8 xx
Check gas connections
→
P. 19, § 3.8 xx
Compressed air station
Check filters, check no liquid penetrates the analyzer
→
P. 13, § 3.4 xxx
Check if filter vessel is clean, if necessary clean and
check cause
→
P. 13, § 3.4 xxx
Check inlet and outlet pressures
→
P. 13, § 3.4 xx
Renew filter
2
2
As required
→
P. 13, § 3.4 xx
System cabinet
Clean or replace fan filter (MCS100E HW)
→
P. 17, § 3.5 xx
Check pump noise ---- x x x
Check or replace the membrane and valve plate
→
P. 23, § 3.9 x
Replace non-return valve
→
P. 23, § 3.9 x
Perform system leak test
→
P. 39, § 3.10 x
Analyzer (Photometer)
Clean or replace fan filter (Analyzer)
→
P. 17, § 3.6 xx
Check and adjust the flow monitor zero point
→
P. 18, § 3.7 xx
Span gas feeding
→
P. 40, § 3.11 xx