Post Installation and Commissioning
Execute the following procedure after installation and commissioning of the 7SR45 Argus Relay.
²
Open the 7SR45 Argus Relay battery cover by removing the screw.
[dw_7SR45_postinstallation_commissioning_step1, 1, en_US]
Figure 3-11
Opening the Battery Cover
²
Flip the 7SR45 Argus Relay battery cover.
3.4
Handling of the Device
3.4 Post Installation and Commissioning
40 Reyrolle, Operating, Manual
C53000-B7040-C101-1, Edition 08.2020