EasyManua.ls Logo

Siemens ARCADIS Orbic 3D - Preparing the System; Connecting, Switching On and Booting; Covering the C-arm with Sterile Covers

Siemens ARCADIS Orbic 3D
132 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ARCADIS Orbic Quick Guide
Examination Procedure
19
Preparing the system
Connecting, switching on and booting
Connect the monitor trolley connecting
cable to the C-arm system (1).
If available, connect the network cable
(if the system is connected to an informa-
tion system or a navigation system or net-
work printer) (2).
Plug the power plug into the power outlet.
Switch on the C-arm system at the moni-
tor trolley (3).
The system boots.
Covering the C-arm with sterile covers
If necessary, cover the C-arm, e.g. with
the two-part sterile cover (4).
Attach the cover with the sterilizable
clamps (5).

Related product manuals