EasyManua.ls Logo

Siemens Cerberus PACE - Page 54

Siemens Cerberus PACE
57 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning and maintenance
18
54 | 57 A6V10430571_en--_c
Function test
Carry out the function test at the specified intervals in accordance with the
local requirements and standards.
Perform the function test on site at the same time as the system
acceptance test
If the system is connected to a fire detection installation (FDI), the function
test must be performed with the FDI connected.
You can test the required visual and acoustic indicating elements according to
EN 54-16 by operating them manually in access level 1 or 2 in accordance with
the configuration of the VACIE.
Check the display and LED for any indication of shutdowns if corresponding
devices are part of the system.
Check the display by pressing the <Buzzer reset/test – Quittierung/Test>
button on PT2004-A1 and PT2007-A1, and the <Silence Buzzer/LED Test>
button on PT2010-A1.
Check the keypad functions.
A full acceptance test must be performed after every time a change is made
to the system.
Testing interval
All indicating elements must be tested every six months.
Cleaning the control panels
To clean the control panels, use a wet cloth without any cleaning agents,
abrasives or solvents.

Table of Contents

Related product manuals