EasyManua.ls Logo

Siemens Climatix S300 HRV - 4.2 ABT Go configuration

Siemens Climatix S300 HRV
170 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.2 ABT Go configuration
The concept for the configuration of the controller is split into 2 parts:
Basic configuration: choosing the functions
Select the desired control functions for the heat recovery ventilation system.
The applications depend on the installed devices and intended use.
Extended configuration: configuring the hardware
Set the required input and output signals at the desired terminals according to the
application choices made in the first step. This includes the controller as well as
peripheral devices.
Setting and changing control parameters is possible with the system running.
During basic and extended configuration, the controller will stop the application.
When leaving the configuration mode, the device will restart.
To access the BACnet registers that are listed in this document, a BACnet
explorer can be used.
To set up the communication to the controller, the Ethernet port can be used.
Note the following facts:
● Application choice and hardware configuration are completely independent.
● There is no automatism that selects input/output signals according to application
choices or that activates application functions depending on hardware settings.
● The controller provides a limited check, reporting configuration error if any
mandatory input or output selections are missing.
● Input and output signal that are optional are not checked.
Configuration
ABT Go configuration
4
26 | 170 A6V10733786_en_c

Table of Contents

Related product manuals