Configuration and operation   
6.2 Project engineering 
  CP 343-1 
46  Manual, 12/2018, C79000−G8976−C201-08 
 
Project engineering 
Project engineering 
To set up the CP for communication services, read the information on configuring in the 
sections Project engineering (Page 28) and Replacing a module without a programming 
device (Page 62). For detailed information on configuration, refer to Part A of this manual, 
see References /1/ (Page 71). 
 
You have the option of changing the mode of the CP between RUN and STOP using the 
STEP 7 configuration software (PLC > Accessible Nodes). 
The CP loads configured and/or downloaded data into the work memory and then changes 
to RUN mode. 
The CP changes to STOP - transitional phase with LED display "Stopping (RUN → STOP"). 
●  Established connections of the open communications services (see also section 
Communication services (Page 12)) are terminated. 
●  The following functions are disabled: 
–  PROFINET IO 
–  Time-of-day synchronization 
●  The following functions remain enabled: 
–  Downloading the configuration data and diagnostics of the CP 
System connections for configuration, diagnostics and PG channel routing still exist. 
–  Web diagnostics (HTTP access) 
–  Routing function 
The configurable module access protection has the following effects on the functions 
described here: 
●  Module access protection: Not locked 
The functions cannot be executed. 
●  Module access protection: Status-dependent 
With this setting, it is only possible to access the CP when the CPU is in STOP mode.