EasyManua.ls Logo

Siemens DESIGO PXM20 - Editing the Switching Points

Siemens DESIGO PXM20
70 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
44/70
Siemens PXM20 / PXM20-E operator unit CM110754en_02
Building Technologies Setting time schedules 17 Dec 2009
9.1.1 Editing the switching points
The exact time and the state which comprise the entry are shown on
the next line, and can be selected for editing. Confirm your entry by
pressing OK.
1.
To change the schedule for this day, select CHANGE
PROGRAM.
2.
Move from one entry to the next within the 24-hour
schedule. The selected entry is marked by a small black
arrow above the 24-hour schedule.
9.1.1.1 Editing an existing entry
Edit existing entries in the normal way, using the associated direct
access keys (the procedure is described in Section 6).
9.1.1.2 Copy 24-hour profile
To copy a 24-hour profile to other days, navigate to the day which is
to be used as a template.
Then go to the line Day copy to and select the days to which you
want to copy the profile; acknowledge with OK for each day.
9.1.1.3 New entry
To add an entry select NEW ENTRY and edit the new entry.
9.1.1.4 Delete entry
To delete an entry, first select the entry to be deleted, and then
select DELETE ENTRY.

Table of Contents

Related product manuals