LE4010-CF & TL300-CF Power Supply Wiring Configuration
(Reference from DSC Installation Manual)
The ACT shall be connected to Input 1 of the transmitter and transmission delay is to be
configured via CONNECT 24.
The LBT and TEST shall be connected to FACP’s trouble inputs. The outputs are active
low (switched to ground) and shall be connected via listed supervision relay (suggested
model: DSC, RM-2 or RM1C).