EasyManuals Logo

Siemens FC2005 User Manual

Siemens FC2005
101 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #91 background imageLoading...
Page #91 background image
86
LE4010-CF & TL300-CF Power Supply Wiring Configuration
(Reference from DSC Installation Manual)
The ACT shall be connected to Input 1 of the transmitter and transmission delay is to be
configured via CONNECT 24.
The LBT and TEST shall be connected to FACP’s trouble inputs. The outputs are active
low (switched to ground) and shall be connected via listed supervision relay (suggested
model: DSC, RM-2 or RM1C).
firealarmresources.com

Table of Contents

Other manuals for Siemens FC2005

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens FC2005 and is the answer not in the manual?

Siemens FC2005 Specifications

General IconGeneral
BrandSiemens
ModelFC2005
CategoryControl Panel
LanguageEnglish

Related product manuals