Installation, connecting up, commissioning
3.2 Overview: Installation, configuration, commissioning
IE/PB LINK PN IO
Operating Instructions, 11/2017, C79000-G8976-C393-02
35
Overview: Installation, configuration, commissioning
Follow the steps as shown below. Installation and configuration can be performed
independently of each other.
Figure 3-1 Installing, connecting up and configuring the LINK