EasyManuals Logo

Siemens IE/PB LINK PN IO User Manual

Siemens IE/PB LINK PN IO
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #43 background imageLoading...
Page #43 background image
Installation, connecting up, commissioning
3.6 Commissioning and startup of the LINK
IE/PB LINK PN IO
Operating Instructions, 11/2017, C79000-G8976-C393-02
43
Information on commissioning
Depending on the configuration tool you are using, you will find information on
commissioning in the following sections:
STEP 7 V5
LINK as PROFINET IO device
See section Commissioning the LINK as a PROFINET IO device (Page 53).
LINK as gateway in standard mode
See section Commissioning the LINK as a gateway (Page 55).
STEP 7 Professional
LINK as PROFINET IO device
See section Commissioning the LINK as a PROFINET IO device (Page 60).
LINK as gateway in standard mode
See section Commissioning the LINK in standard mode (Page 61).
For information on saving the configuration data when turning off the power supply and when
changing from RUN to STOP, see section Changing from RUN to STOP (Page 44).
Commissioning when using bus adapters
If you use bus adapters instead of the Ethernet interface, follow the steps below during
commissioning:
1. First download the configuration data.
2. Then turn off the power.
3. Now plug in the bus adapter connected to the network.
4. Turn on the power.
Only now is the interface X3 of the bus adapter active and the ports X1P1R / X1P2R of
the integrated Ethernet interface are deactivated.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens IE/PB LINK PN IO and is the answer not in the manual?

Siemens IE/PB LINK PN IO Specifications

General IconGeneral
BrandSiemens
ModelIE/PB LINK PN IO
CategoryGateway
LanguageEnglish

Related product manuals